Phone System Foundation Fabrication & Installation

Bluepoint Engineering LLC was contracted by GBS Group under Customer PO #PO010509 to fabricate and install four custom equipment foundations for the vessel’s new telephone system.

  • Vessel: NOAAS Oscar Dyson
  • Client: GBS Group
  • The Team: 2 Bluepoint Engineers

Phase 1: ET Shop Installation (01-47-2)

Our team executed precision fabrication and hardware mounting within the ET Shop space:

  • MCT Installation: Fitted and installed two aluminum bolt-in Multi-Cable Transits (MCTs).
  • Power & Storage Support: Fabricated and mounted a custom 3-tier rack for the phone system battery array.
  • Transformer Mounting: Securely installed the system transformer on the inboard bulkhead.
  • Cabinet Foundation: Custom-fabricated and installed the main phone cabinet foundation, securing all components by drilling, tapping, and bolting directly to the deck.

Phase 2: Pilot House Modifications (03-34-0)

Custom foundation work tailored to ongoing vessel operational needs:

  • P/A G/A Foundation: Precision-fabricated and installed the P/A G/A cabinet foundation, securely stud-bolted to the deck.
  • Equipment Integration: Coordinated with on-site cable pullers to temporarily hold cabinet mounting, allowing seamless cable routing prior to final enclosure securing.

Phase 3: Bow Deck Speaker Foundation (01 Level)

On-site deck modifications executed with real-time operational flexibility:

  • Fabrication & Placement: Fabricated a heavy-duty speaker foundation originally scheduled for Frame 3.
  • Field Adjustment: Repositioned and mounted the assembly at Frame 1 near the bull nose per direct instructions from the Port Engineer, with full approval from GBS personnel.

Mission Accomplished

  • Quality Verified: All foundation fabrication, placement, and hardware installations were thoroughly inspected.
  • Client Sign-off: Completed work was officially reviewed and fully approved by GBS personnel on site.
  • Result: NOAAS Oscar Dyson received a fully custom-built, secure structural foundation framework ready for immediate phone system commissioning.

Related Job Stories

SODERMAN CSW Spool Piece Emergent Repairs

Job Story: Emergency Marine Piping Replacement & ABS Certification Bluepoint Engineering LLC was contracted to attend the MV William A....

USCG Shinnecock Gear Repair

Job Story: Twin Disc Reduction Gear Overhaul & Testing Bluepoint Engineering LLC responded to US Coast Guard Station Shinnecock under...

DAHL Shaft Earthing and Monitoring

Job Story: Upgrading Shaft Grounding Equipment  Bluepoint Engineering LLC was contracted by Patriot Lines (via Bayonne Dry Dock) to overhaul...