Bluepoint Engineering LLC was contracted by GBS Group under Customer PO #PO010509 to fabricate and install four custom equipment foundations for the vessel’s new telephone system.
- Vessel: NOAAS Oscar Dyson
- Client: GBS Group
- The Team: 2 Bluepoint Engineers
Phase 1: ET Shop Installation (01-47-2)
Our team executed precision fabrication and hardware mounting within the ET Shop space:
- MCT Installation: Fitted and installed two aluminum bolt-in Multi-Cable Transits (MCTs).
- Power & Storage Support: Fabricated and mounted a custom 3-tier rack for the phone system battery array.
- Transformer Mounting: Securely installed the system transformer on the inboard bulkhead.
- Cabinet Foundation: Custom-fabricated and installed the main phone cabinet foundation, securing all components by drilling, tapping, and bolting directly to the deck.
Phase 2: Pilot House Modifications (03-34-0)
Custom foundation work tailored to ongoing vessel operational needs:
- P/A G/A Foundation: Precision-fabricated and installed the P/A G/A cabinet foundation, securely stud-bolted to the deck.
- Equipment Integration: Coordinated with on-site cable pullers to temporarily hold cabinet mounting, allowing seamless cable routing prior to final enclosure securing.
Phase 3: Bow Deck Speaker Foundation (01 Level)
On-site deck modifications executed with real-time operational flexibility:
- Fabrication & Placement: Fabricated a heavy-duty speaker foundation originally scheduled for Frame 3.
- Field Adjustment: Repositioned and mounted the assembly at Frame 1 near the bull nose per direct instructions from the Port Engineer, with full approval from GBS personnel.
Mission Accomplished
- Quality Verified: All foundation fabrication, placement, and hardware installations were thoroughly inspected.
- Client Sign-off: Completed work was officially reviewed and fully approved by GBS personnel on site.
- Result: NOAAS Oscar Dyson received a fully custom-built, secure structural foundation framework ready for immediate phone system commissioning.