Job Story: Emergency Marine Piping Replacement & ABS Certification

Bluepoint Engineering LLC was contracted to attend the MV William A. Soderman in support of its Turbo Activation, performing urgent emergent repairs on the main salt water (CSW) overboard waster spool piece to the satisfaction of the ABS surveyor.

  • Vessel: MV William A. Soderman
  • Client: Patriot Lines
  • The Team: Bluepoint Engineers, ABS Certified Welder, and Laborers

Phase 1: Logistics & Emergency Transport

  • Transport: On April 27, 2026, Bluepoint Engineering transported a replacement 24” spare spool piece from the USNS Cornelius H. Charlton in Baltimore, MD directly to the MV William A. Soderman docked in Norfolk, VA.

Phase 2: Removal & Precision Fabrication

  • Removal: Safely removed the existing, leaking 1/8” carbon steel spool piece from the main salt water overboard line.
  • Targeting & Welding: Fitted and targeted the free flange on the upgraded 3/8” thick (Schedule 20) heavy-duty pipe spool piece and executed production welding on site.
  • Bench Testing: Conducted bench pressure testing at 50 PSI air pressure to guarantee weld integrity prior to installation.

Phase 3: Installation & Operational Verification

  • Installation: Fitted the newly fabricated spool piece using fresh gaskets and secured all flanged connections.
  • Testing: Performed comprehensive operational testing across system pressures.
  • Ultrasonic Inspection: Conducted UT thickness gauging (in inches) across multiple clock positions on the downstream overboard elbow to establish baseline wear data.

Mission Accomplished

  • Tested: Pressure and operational testing completed without issue.
  • Certified: All repairs performed and approved to the full satisfaction of the ABS Surveyor and vessel leadership.
  • Result: The MV William A. Soderman successfully completed its emergent repair window and remained on schedule for Turbo Activation.

Related Job Stories

Phone System Foundation Fabrication & Installation

Bluepoint Engineering LLC was contracted by GBS Group under Customer PO #PO010509 to fabricate and install four custom equipment foundations...

USCG Shinnecock Gear Repair

Job Story: Twin Disc Reduction Gear Overhaul & Testing Bluepoint Engineering LLC responded to US Coast Guard Station Shinnecock under...

DAHL Shaft Earthing and Monitoring

Job Story: Upgrading Shaft Grounding Equipment  Bluepoint Engineering LLC was contracted by Patriot Lines (via Bayonne Dry Dock) to overhaul...